Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 5 results ...

Bowen, P A and Edwards, P J (1985) Cost modelling and price forecasting: practice and theory in perspective. Construction Management and Economics, 3(03), 199-215.

Cusack, M M (1985) A simplified approach to the planning and control of cost and project duration. Construction Management and Economics, 3(03), 183-98.

Hillebrandt, P M and Meikle, J L (1985) Resource planning for construction. Construction Management and Economics, 3(03), 249-63.

Nahapiet, H and Nahapiet, J (1985) A comparison of contractual arrangements for building projects. Construction Management and Economics, 3(03), 217-31.

  • Type: Journal Article
  • Keywords: contract management; organization building
  • ISBN/ISSN: 0144-6193
  • URL: https://doi.org/10.1080/01446198500000016
  • Abstract:

    This paper considers contracts from an organizational perspective, comparing the major forms of contracts available for building projects and examining the factors influencing their selection. The analysis is based on the findings of a study of ten building projects, six in the USA and four in the UK, together with the results of a survey of those prominent in the industry. A comparison of five different contractual arrangements indicate that they establish different patterns of responsibilities and relationships between clients and the various parties involved in building projects. In so doing, they are regarded clients differing combinations of expertise, risk, flexibility and cost. For the projects studied, three factors were found to be related to contract selection: The characteristics of clients, particularly their experience and expertise in construction, the level of performance required by clients and the construction complexity of projects. These findings, together with previous research, suggest that it is unlikely that there is one ’best’ form of contract for building projects. Rather, which is the appropriate contractual arrangement varies according to the particular set of project circumstances, especially the type of client, his time and cost requirement and the characteristics of the projects.

Sözen, Z (1985) Size, technology and aspects of structure in contractor firms Turkey. Construction Management and Economics, 3(03), 233-47.